Chemistry and innovative materials

Our Clients

Specific skills

  • Process Engineering
  • Mechanical equipment
  • Utilities and Piping
  • Civil Engineering & Building
  • EIA
  • Effluent treatment
  • Design office

See more

Some achievements

AXENS – Catalyst production

AXENS – Catalyst production

Implementation of a new catalyst production line in an existing workshop Location: Salindres, Gard FRANCE Project phase: Studies and implementation Project duration: 18 months
read more
MERCK – Industrial Transfer

MERCK – Industrial Transfer

Completion of the industrial transfer of a nanosphere and polymer microsphere manufacturing unit. Location : Meyzieu, Rhône FRANCE Project phases : Detailed design and implementation (studies and monitoring of the transfer) Project duration : 3-month detailed design and 18-month implementation
read more
CONFIDENTIAL – Perfume manufacturer

CONFIDENTIAL – Perfume manufacturer

Basic studies utilities, HVAC, electricity CF cf, second work, detection and fire protection Project phase : Basic studies for utilities, electricity, finishing, fire detection and protection. Project duration : 1 year
read more
EURECAT – Revamping

EURECAT – Revamping

Revamping and refurbishment of catalyst production lines Location : La Voulte sur Rhône FRANCE Project phase : Basic studies for noise and dust reduction on two existing catalyst regeneration plants.µ Project duration : 4 months
read more
TREDI – Bromine Manufacturing

TREDI – Bromine Manufacturing

Unit for manufacturing bromine from used bromine brines Location: Plaine de l'Ain Industrial Park - Saint-Vulbas (01) Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs. Study period: 2 months
read more
SANOFI – New treatment plant

SANOFI – New treatment plant

New effluent treatment plant for the vaccines business Location: Neuville-sur- Saône (69) Project Phases: Detailed Preliminary Project Study Study period: 2 months
read more
AXENS – Recovery station

AXENS – Recovery station

Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops Location: Salindres (30) Project phase: Study, implementation and start-up Project duration: 18 months
read more
ALTEO – Press Filter & STEP CO2

ALTEO – Press Filter & STEP CO2

Treatment of effluents from the alumina production plant before discharge into the sea Location: Gardanne (13) Project phases: Studies, implementation and commissioning Project duration: 24 months (1st step) + 18 months (2nd step)
read more

CONFIDENTIAL CLIENT

Audit, improvement, reliability and debottlenecking of an effluent treatment plant Project phases: Feasibility studies Study period: 3 months
read more