Chemistry and innovative materials
Our Clients
Specific skills
- Process Engineering
- Mechanical equipment
- Utilities and Piping
- Civil Engineering & Building
- EIA
- Effluent treatment
- Design office
Some achievements
ADISSEO – New production plant
New methionine production plant
Location : Nanjing (China)
Project phase : Studies
Duration of the study : 4 months
AXENS – Catalyst production
Implementation of a new catalyst production line in an existing workshop
Location: Salindres, Gard FRANCE
Project phase: Studies and implementation
Project duration: 18 months
MERCK – Industrial Transfer
Completion of the industrial transfer of a nanosphere and polymer microsphere manufacturing unit.
Location : Meyzieu, Rhône FRANCE
Project phases : Detailed design and implementation (studies and monitoring of the transfer)
Project duration : 3-month detailed design and 18-month implementation
CONFIDENTIAL – Perfume manufacturer
Basic studies utilities, HVAC, electricity CF cf, second work, detection and fire protection
Project phase : Basic studies for utilities, electricity, finishing, fire detection and protection.
Project duration : 1 year
EURECAT – Revamping
Revamping and refurbishment of catalyst production lines
Location : La Voulte sur Rhône FRANCE
Project phase : Basic studies for noise and dust reduction on two existing catalyst regeneration plants.µ
Project duration : 4 months
NANOMAKERS – Production of nanoparticles
Specialty Industry – New Production Line for Silicon Carbide Nanoparticles
Location: Rambouillet (78)
Project phase: Engineering studies
Project duration: 18 months
TREDI – Bromine Manufacturing
Unit for manufacturing bromine from used bromine brines
Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months
ARKEMA – Saint-Auban
Redesign of effluent treatment
Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months
SANOFI – New treatment plant
New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months
AXENS – Catalyst production, Kentucky, USA
Revamping and refurbishment of catalyst production lines
Location: Kentucky, USA
Project phase: Studies
Project duration: 30 months
AXENS – Catalyst production, Virginia, USA
Debottlenecking of a catalyst impregnation production line
Location: West Virginia, USA
Project phase: APS and APD studies
Project duration: 14 months
AXENS – Catalyst production, Saudi Arabia
Modification of a catalyst impregnation production line
Location: Saudi Arabia
Project phase: Basic and detailed design studies
Project duration: 22 months
AXENS – Recovery station
Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops
Location: Salindres (30)
Project phase: Study, implementation and start-up
Project duration: 18 months
AXENS – Organic wastewater treatment
Debottlenecking of a biological treatment plant for liquid effluents
Project phase : Basic and detailed design studies
ALTEO – Press Filter & STEP CO2
Treatment of effluents from the alumina production plant before discharge into the sea
Location: Gardanne (13)
Project phases: Studies, implementation and commissioning
Project duration: 24 months (1st step) + 18 months (2nd step)
CONFIDENTIAL CLIENT
Audit, improvement, reliability and debottlenecking of an effluent treatment plant
Project phases: Feasibility studies
Study period: 3 months