Revamping and refurbishment of catalyst production lines
Location: Kentucky, USA
Project phase: Studies
Project duration: 30 months
Feasibility / Basic design studies:
- Carrying out balances (material, heat, utility, power)
- Implementation of PFDs (process flow diagram)
- Sizing of equipment and storage capacities
- Implementation in the existing workshop
- Preliminary security analysis
- CAPEX, planning
Detailed design study (Process part):
- Realization of PIDs (piping and instrumentation diagram)
- Writing the functional analysis
- Participation in HAZOP (Hazard and Operability analysis)
- Drafting of technical specifications for equipment
Total amount of the project : AXENS – Catalyst production, Kentucky, USA :
Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million