Industrial effluents

Our Clients

Specific skills

  • Diagnosis and definition of treatment pathway
    • Analysis of dysfunctions in existing treatment
    • Definition of process chain

  • General installation
  • Choice of equipment

See more

Some achievements

EVERE – Fos-sur-Mer

EVERE – Fos-sur-Mer

Audit, improvement, reliability and debottlenecking of the wastewater treatment plant Location : Fos-sur-Mer (13) Project phases: Feasibility studies Study period: 2 months
read more
ARKEMA – Effluent treatment

ARKEMA – Effluent treatment

Treatment of effluents from the Pierre Bénite plant Location: Pierre Bénite (69) Project phases: Diagnosis, Project Management Assistance, EPCM Project duration: 18 months
read more
CARBONE SAVOIE – Smoke treatment

CARBONE SAVOIE – Smoke treatment

Implementation of smoke treatment for all existing furnaces Location: Vénissieux, Rhône, FRANCE Project phase : Studies and implementation Project duration : 18 months
read more
ONDRAF – Treatment of radioactive effluents

ONDRAF – Treatment of radioactive effluents

Turnkey project for the construction of a skid for the treatment (COD: Determination of Chemical Oxygen Demand) of radioactive effluents from the dismantling of a workshop at a nuclear site. Location: Dessel, Belgium Project phases: Study, realization, assembly and start-up Project duration: 36 months
read more
TREDI – Bromine Manufacturing

TREDI – Bromine Manufacturing

Unit for manufacturing bromine from used bromine brines Location: Plaine de l'Ain Industrial Park - Saint-Vulbas (01) Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs. Study period: 2 months
read more
SANOFI – New treatment plant

SANOFI – New treatment plant

New effluent treatment plant for the vaccines business Location: Neuville-sur- Saône (69) Project Phases: Detailed Preliminary Project Study Study period: 2 months
read more
AXENS – Recovery station

AXENS – Recovery station

Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops Location: Salindres (30) Project phase: Study, implementation and start-up Project duration: 18 months
read more
ALTEO – Press Filter & STEP CO2

ALTEO – Press Filter & STEP CO2

Treatment of effluents from the alumina production plant before discharge into the sea Location: Gardanne (13) Project phases: Studies, implementation and commissioning Project duration: 24 months (1st step) + 18 months (2nd step)
read more

CONFIDENTIAL CLIENT

Audit, improvement, reliability and debottlenecking of an effluent treatment plant Project phases: Feasibility studies Study period: 3 months
read more