Industrial effluents

Our Clients

Specific skills

  • Diagnosis and definition of treatment pathway
    • Analysis of dysfunctions in existing treatment
    • Definition of process chain

  • General installation
  • Choice of equipment

See more

Some achievements

EVERE – Fos-sur-Mer

EVERE – Fos-sur-Mer

Audit, improvement, reliability and debottlenecking of the wastewater treatment plant
Location : Fos-sur-Mer (13)
Project phases: Feasibility studies
Study period: 2 months

read more
ARKEMA – Effluent treatment

ARKEMA – Effluent treatment

Treatment of effluents from the Pierre Bénite plant
Location: Pierre Bénite (69)
Project phases: Diagnosis, Project Management Assistance, EPCM
Project duration: 18 months

read more
ONDRAF – Treatment of radioactive effluents

ONDRAF – Treatment of radioactive effluents

Turnkey project for the construction of a skid for the treatment (COD: Determination of Chemical Oxygen Demand) of radioactive effluents from the dismantling of a workshop at a nuclear site.
Location: Dessel, Belgium
Project phases: Study, realization, assembly and start-up
Project duration: 36 months

read more
TREDI – Bromine Manufacturing

TREDI – Bromine Manufacturing

Unit for manufacturing bromine from used bromine brines
Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months

read more
SANOFI – New treatment plant

SANOFI – New treatment plant

New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months

read more
AXENS – Recovery station

AXENS – Recovery station

Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops
Location: Salindres (30)
Project phase: Study, implementation and start-up
Project duration: 18 months

read more
ALTEO – Press Filter & STEP CO2

ALTEO – Press Filter & STEP CO2

Treatment of effluents from the alumina production plant before discharge into the sea
Location: Gardanne (13)
Project phases: Studies, implementation and commissioning
Project duration: 24 months (1st step) + 18 months (2nd step)

read more

CONFIDENTIAL CLIENT

Audit, improvement, reliability and debottlenecking of an effluent treatment plant
Project phases: Feasibility studies
Study period: 3 months

read more