Turnkey project for the construction of a skid for the treatment (COD: Determination of Chemical Oxygen Demand) of radioactive effluents from the dismantling of a workshop at a nuclear site.

Location: Dessel, Belgium
Project phases: Study, realization, assembly and start-up
Project duration: 36 months

Project context: Turnkey project in partnership with a local company for the construction of a unit to treat organic matter contained in radioactive effluents.

Studies for the treatment of radioactive effluents :

  • From the treatment process defined upstream: assessments, sizing of equipment and drafting of technical specifications of equipment
  • 3D design and implementation of the skid

Realization and start-up :

  • Equipment purchases
  • Follow-up of manufacturing at equipment suppliers
  • Quality Assurance file
  • FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) of the complete skid after assembly
  • Assistance with start-up and performance testing

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

Particular point: Installation of the skid in a contaminated cell