Treatment of effluents from the Pierre Bénite plant

Location: Pierre Bénite (69)
Project phases: Diagnosis, Project Management Assistance, EPCM
Project duration: 18 months

Project background: The treatment plant for industrial effluents from the ARKEMA Pierre Bénite plant has very strict discharge constraints (5 mg/l).

EMDELEN has been entrusted with:

  • A diagnosis of the existing sector and the definition of the additional installations to be carried out, on the basis of sampling and test bench with the help of the expertise of our partner INSITUO ;
  • Assistance to the Contracting Authority in its discussions with the water treatment company, the choice of equipment, the general planning of the operation and the costing of the work to be carried out;
  • Project management for equipment, general and ancillary installations to be provided for outside the scope of the water treatment plant, including the drafting of specifications and technical specifications, the analysis of bids, the follow-up of execution studies, the punctual follow-up of on-site work and acceptance operations.

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

Notice point : Construction of a settling pond