Industrial effluents
Our Clients
Specific skills
- Diagnosis and definition of treatment pathway
- Analysis of dysfunctions in existing treatment
- Definition of process chain
- General installation
- Choice of equipment
Some achievements
EVERE – Fos-sur-Mer
Audit, improvement, reliability and debottlenecking of the wastewater treatment plant
Location : Fos-sur-Mer (13)
Project phases: Feasibility studies
Study period: 2 months
ARKEMA – Effluent treatment
Treatment of effluents from the Pierre Bénite plant
Location: Pierre Bénite (69)
Project phases: Diagnosis, Project Management Assistance, EPCM
Project duration: 18 months
CARBONE SAVOIE – Smoke treatment
Implementation of smoke treatment for all existing furnaces
Location: Vénissieux, Rhône, FRANCE
Project phase : Studies and implementation
Project duration : 18 months
ONDRAF – Treatment of radioactive effluents
Turnkey project for the construction of a skid for the treatment (COD: Determination of Chemical Oxygen Demand) of radioactive effluents from the dismantling of a workshop at a nuclear site.
Location: Dessel, Belgium
Project phases: Study, realization, assembly and start-up
Project duration: 36 months
TREDI – Bromine Manufacturing
Unit for manufacturing bromine from used bromine brines
Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months
ARKEMA – Saint-Auban
Redesign of effluent treatment
Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months
SANOFI – New treatment plant
New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months
AXENS – Recovery station
Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops
Location: Salindres (30)
Project phase: Study, implementation and start-up
Project duration: 18 months
AXENS – Organic wastewater treatment
Debottlenecking of a biological treatment plant for liquid effluents
Project phase : Basic and detailed design studies
ALTEO – Press Filter & STEP CO2
Treatment of effluents from the alumina production plant before discharge into the sea
Location: Gardanne (13)
Project phases: Studies, implementation and commissioning
Project duration: 24 months (1st step) + 18 months (2nd step)
CONFIDENTIAL CLIENT
Audit, improvement, reliability and debottlenecking of an effluent treatment plant
Project phases: Feasibility studies
Study period: 3 months