Chemistry & Innovative Materials Archives - Emdelen https://emdelen.fr/en/category/chemistry-materials-innovative/ Designing today the industrial facilities of the future Fri, 14 Feb 2020 11:01:37 +0000 en-GB hourly 1 https://emdelen.fr/wp-content/uploads/2018/10/cropped-LogoRVB_marge-droite-32x32.png Chemistry & Innovative Materials Archives - Emdelen https://emdelen.fr/en/category/chemistry-materials-innovative/ 32 32 ADISSEO – New production plant https://emdelen.fr/en/adisseo-new-production-plant/?utm_source=rss&utm_medium=rss&utm_campaign=adisseo-new-production-plant Tue, 26 Mar 2019 08:14:29 +0000 https://emdelen.fr/?p=3756 New methionine production plant
Location : Nanjing (China)
Project phase : Studies
Duration of the study : 4 months

L’article ADISSEO – New production plant est apparu en premier sur Emdelen.

]]>

New methionine production plant

Location : Nanjing (China)
Project phase : Studies
Duration of the study : 4 months

Context of the project : A major industrial project of Adisseo and BlueStar, the Nanjing methionine manufacturing plant became operational in 2013. This project was an industrial challenge with more than 25 different chemical units needed to produce methionine, all located on the same site. Emdelen was entrusted with the ammonia unloading, storage and evaporation units.

Emdelen Mission : Process Design Package of the unit, including:

  • The definition of the capacities of truck unloading bay
  • The definition of the 2 storage tanks of liquefied ammonia liquid, 680 m3 with double compartments: storage and vaporization compartments
  • Sizing of the double heating jacket of the storage compartment
  • Sizing of the tubular ammonia vaporisation heat exchanger
  • Regulation of the gaseous ammonia flow to other units
  • Preparation, storage and distribution of alkali (mixture of liquid ammonia and demineralised water)
  • The realization of the PFDs (process flow diagram) associated with mass balances
  • The implementation of PID (piping and instrumentation diagram)
  • The drafting of equipment data-sheets (tanks, heat exchangers, pumps, discharge compressors, discharge arms), safety and thermal expansion valves, control valves and instruments
  • The drafting of the process book including the description of the commissioning phase, normal operation and shutdown phases of the unit
  • Safety studies (Cause & Effect Matrix, Hazop, SIL level of safety instrumented functions)
  • Environmental studies (collection of liquid and gaseous effluents, washing column)
  • The unit’s layout plans

Total amount of the project:

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on chemistry and innovative materials by clicking on the link.

L’article ADISSEO – New production plant est apparu en premier sur Emdelen.

]]>
AXENS – Catalyst production https://emdelen.fr/en/axens-catalyst-production/?utm_source=rss&utm_medium=rss&utm_campaign=axens-catalyst-production Fri, 15 Feb 2019 10:04:08 +0000 https://emdelen.fr/?p=3352 Implementation of a new catalyst production line in an existing workshop
Location: Salindres, Gard FRANCE
Project phase: Studies and implementation
Project duration: 18 months

L’article AXENS – Catalyst production est apparu en premier sur Emdelen.

]]>

Implementation of a new catalyst production line in an existing workshop

Location: Salindres, Gard FRANCE
Project phase: Studies and implementation
Project duration: 18 months

AXENS is a company of the IFP group. AXENS manages both the production of catalysts and adsorbents as well as the continuous research of their best technologies as a licensor. Its main activities are related to the petrochemical, refinery and gas industries, and more recently to certain fields of industrial water treatment.

To achieve its objectives, AXENS asked EMDELEN to carry out the studies, from the Detailed Preliminary Design phase to the orders undertaken, and to manage the phase of the studies undertaken for the construction of a new line in an existing workshop.

Studies :

  • Project Quality Plan
  • assessments (material, heat, utility, power)
  • Implementation of PFDs (process flow diagram) and then PIDs (piping and instrumentation diagram)
  • Sizing of new equipment and storage capacities
  • Elaboration of project lists (equipment, motors, piping, valves, cables)
  • Implementation of the whole project in the existing workshop
  • Preliminary security analysis
  • Drafting of new functional analyses
  • Drafting of preliminary technical specifications for preliminary design consultation: equipment and works contracts (civil engineering, structure and framework, piping, electricity / instrumentation / automation, “centralized dust collection” package)
  • CAPEX and implementation planning

Realisation :

  • EMDELEN execution studies:
    • Review of the above study documents
    • Realisation of isometrics
    • Realisation of equipment guide plans
    • Datasheets instrumentation
    • Elaboration and supervision of the consultation files until order placement -> 28 equipment lots and 8 work lots
  • Supervision of suppliers during their studies:
    • Launch meetings
    • Document visas
    • Validation of product sheets and specifications

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on chemistry and innovative materials by clicking on the following link.

L’article AXENS – Catalyst production est apparu en premier sur Emdelen.

]]>
MERCK – Industrial Transfer https://emdelen.fr/en/merck-industrial-transfer/?utm_source=rss&utm_medium=rss&utm_campaign=merck-industrial-transfer Thu, 14 Feb 2019 12:17:37 +0000 https://emdelen.fr/?p=3209 Completion of the industrial transfer of a nanosphere and polymer microsphere manufacturing unit.
Location : Meyzieu, Rhône FRANCE
Project phases : Detailed design and implementation (studies and monitoring of the transfer)
Project duration : 3-month detailed design and 18-month implementation

L’article MERCK – Industrial Transfer est apparu en premier sur Emdelen.

]]>

Completion of the industrial transfer of a nanosphere and polymer microsphere manufacturing unit.

Location : Meyzieu, Rhône FRANCE
Project phases : Detailed design and implementation (studies and monitoring of the transfer)
Project duration : 3-month detailed design and 18-month implementation

Within the MERCK group, the ESTAPOR division has been designing and manufacturing nanospheres and microspheres of polymers, magnetic or not, since 1993.

MERCK wanted to regroup ESTAPOR’s premises, initially in Pithiviers, on its Meyzieu site. For this purpose, MERCK had decided to rely on the services of an industrial engineering team to confirm the preliminary design studies and manage the complete transfer, from the shutdown of the units and the management of the stocks before transfer to the complete reassembly on the host site. The transfer concerned the two ESTAPOR businesses: laboratory (clean rooms) and production (grey rooms). The reception site was completely dismantled since the previous activity was still in place on the floors.

Studies :

  • Transfer of incorrect existing PIDs
  • Miscellaneous list: equipment, piping, cables
  • Fluid balance assessment
  • Assessment of the premises under controlled atmosphere HVAC)
  • Single line diagrams of electrical connections
  • Implantations and facade plans for the architect’s file:
    • Laboratory part with type constraints: place on benches, hot, cold, compressed air, nitrogen, purified water, safety showers
    • Workshop part with type constraints: staff flows, material flows (no crossing of certain clean and dirty flows), maintainability, future evolution towards several parallel lines, integration of grey rooms and air handling units
  • Presentation of these studies to the other actors of the project: ESTAPOR France client, MERCK Germany decision-maker, MERCK France host site, local architect
  • Control-command architecture
  • Functional analysis
  • Allocation
  • Interface tables for all fluids, high and low current electricity, ESP
  • Interface positioning plan
  • CAPEX
  • Planning
  • Lots concerned :
    • Dismantling and preparation of the reception building
    • Industrial transfer
    • Civil engineering and soil studies
    • Electricity / Instrumentation / Automation
    • HVAC and cold room 120m²
    • Laboratory furniture and articulated arms
    • Piping system
    • Glass reactors

Realization :

  • Drafting of order specifications: equipment and works contracts
  • Assistance in placing orders
  • Follow-up of supplier and construction company studies
  • Budget monitoring
  • Follow-up of the planning
  • Realization of the inventory plans
  • Facilitation and writing of site reports
  • Completion receipts
  • Establishment and follow-up of reserve lists

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on chemistry and innovative materials by clicking on the following link.

L’article MERCK – Industrial Transfer est apparu en premier sur Emdelen.

]]>
CONFIDENTIAL – Perfume manufacturer https://emdelen.fr/en/perfume-manufacturer-basic-studies/?utm_source=rss&utm_medium=rss&utm_campaign=perfume-manufacturer-basic-studies Thu, 14 Feb 2019 12:05:07 +0000 https://emdelen.fr/?p=3166 Basic studies utilities, HVAC, electricity CF cf, second work, detection and fire protection
Project phase : Basic studies for utilities, electricity, finishing, fire detection and protection.
Project duration : 1 year

L’article CONFIDENTIAL – Perfume manufacturer est apparu en premier sur Emdelen.

]]>

Basic studies utilities, HVAC, electricity CF cf, second work, detection and fire protection

Project phase : Basic studies for utilities, electricity, finishing, fire detection and protection.
Project duration : 1 year

Our confidential client is one of the world leaders in perfumery and flavours. It is the source of a long list of the most famous flavours and aromas you enjoy every day.

The project consisted in expanding the perfume factory, doubling the surface area of the building, offering a storage capacity equivalent to 12,000 pallets, with 25 self-guided vehicles for the transport of components as well as four computer-aided production lines supplied via 60 km of piping.

For this project, the client entrusted EMDELEN with the following studies:

  • APD utilities

    • Air Conditioning/Ventilation/Heating (HVAC)
    • Ice water distribution network.
    • Refrigeration units
    • Hot water distribution network
    • High voltage electricity, lightning protection, lighting
    • Low voltage electricity, telephony, IT, time distribution, remote display, fire detection, alarm, access control, video surveillance, gas detection
    • Sanitary facilities
    • Sanitary appliances
    • Water networks of various qualities
    • Compressed air and high vacuum
    • Fire protection (sprinkler)
    • Centralized Technical Management (CTM) of the building
  • APD Secondary work

    • Partition wall – ceiling – insulation lot
    • Tile set – faïence
    • Soft floor lot
    • Plastering and painting batch
    • Sanitary equipment batch
    • Wooden interior joinery set (door)
    • Locksmith’s shop (incl. railing, handrail, grille)
    • Hot and cold room construction set
  • APD fire detection and protection

    • Risk classification in the new premises
    • Hydraulic calculations
    • Establishment of a PFD (Process Flow Sheet) sprinkler
    • Establishment of the consultation specifications
    • Verification of the sizing of the water source
    • Implementation of fire protection for the 18-storey automatic storage warehouse for flammable liquids.
    • Feasibility study of high expansion protection and comparison with the sprinkler solution

Total amount of the project:

Range A: < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D: > €50 million

You can find our various realizations on chemistry and innovative materials by clicking on the link.

L’article CONFIDENTIAL – Perfume manufacturer est apparu en premier sur Emdelen.

]]>
EURECAT – Revamping https://emdelen.fr/en/eurecat-revamping/?utm_source=rss&utm_medium=rss&utm_campaign=eurecat-revamping Fri, 15 Feb 2019 09:58:16 +0000 https://emdelen.fr/?p=3350 Revamping and refurbishment of catalyst production lines
Location : La Voulte sur Rhône FRANCE
Project phase : Basic studies for noise and dust reduction on two existing catalyst regeneration plants.µ
Project duration : 4 months

L’article EURECAT – Revamping est apparu en premier sur Emdelen.

]]>

Revamping and refurbishment of catalyst production lines

Location : La Voulte sur Rhône FRANCE
Project phase : Basic studies for noise and dust reduction on two existing catalyst regeneration plants.µ
Project duration : 4 months

A subsidiary owned equally by IFPEN and the American chemical group Albemarle, Eurecat is a service company mainly active in the refining industry.

EURECAT is at the forefront of providing services and solutions for the management of industrial units, in particular through the regeneration, conditioning, contract production or recycling of catalysts.

For its installations, EURECAT wanted an HSE and process improvement study to be carried out in order to know the potential gains and the corresponding investment cost.

Studies :

  • Carrying out balances (material, heat, utility, power)
  • Implementation of PFDs (process flow diagram) and then PIDs (piping & instrumentation diagram)
  • Sizing of new equipment and storage capacities
  • Implementation of the whole in the existing workshop
  • Study of the dust collection network
  • Preliminary security analysis
  • Drafting of new functional analyses
  • CAPEX, planning

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on chemistry and innovative materials by clicking on the following link.

L’article EURECAT – Revamping est apparu en premier sur Emdelen.

]]>
NANOMAKERS – Production of nanoparticles https://emdelen.fr/en/nanomakers-production-of-nanoparticles/?utm_source=rss&utm_medium=rss&utm_campaign=nanomakers-production-of-nanoparticles Thu, 14 Feb 2019 12:02:53 +0000 https://emdelen.fr/?p=3161 Specialty Industry - New Production Line for Silicon Carbide Nanoparticles
Location: Rambouillet (78)
Project phase: Engineering studies
Project duration: 18 months

L’article NANOMAKERS – Production of nanoparticles est apparu en premier sur Emdelen.

]]>

Specialty Industry – New Production Line for Silicon Carbide Nanoparticles

Location: Rambouillet (78)
Project phase: Engineering studies
Project duration: 18 months

Project background: the start-up NANOMAKERS called on EMDELEN to strengthen its capacity to produce nanoparticles, which are generated from a laser pyrolysis process. Main applications: reinforcement of polymer or composite materials, lithium-ion batteries.

  • Review of the production rate to increase the plant’s productivity
  • Assessment, sizing of equipment and drafting of technical specifications
  • Implementation of the new production line in the existing workshop
  • Work specification (piping, EIA)
  • Writing of the functional analysis and HAZOP
  • Writing a process book

Total amount for the project:

Range A: < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

Special point: New “zero emission” production line (gas, dust, etc.) with maximum containment and vacuum work.

You can find our different realizations on cheminstry and innovative materials by clicking on the following link.

L’article NANOMAKERS – Production of nanoparticles est apparu en premier sur Emdelen.

]]>
TREDI – Bromine Manufacturing https://emdelen.fr/en/tredi-bromine-manufacturing/?utm_source=rss&utm_medium=rss&utm_campaign=tredi-bromine-manufacturing Thu, 14 Feb 2019 13:13:37 +0000 https://emdelen.fr/?p=3276 Unit for manufacturing bromine from used bromine brines
Location: Plaine de l'Ain Industrial Park - Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months

L’article TREDI – Bromine Manufacturing est apparu en premier sur Emdelen.

]]>

Unit for manufacturing bromine from used bromine brines

Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months

Tredi, a company specialising in the treatment of industrial waste, is planning to build a bromine manufacturing unit (Br2, 30,000 t/year) using used bromine brines (sodium bromide and/or potassium bromide in aqueous solutions of varying concentrations.

Project background: Tredi has the technology to extract bromine from brine for lower production and wants to obtain a Capex for 30,000 t/year based on this technology.

Emdelen Mission : 

  • Definition of the block diagram of the unit defining the main functions
    • Used brine disposal area
    • Storage of used and purified brines
    • Static furnace and hardening
    • Oil discharge area and oil storage for furnace combustion
    • Treatment of combustion fumes
    • Bromine extraction and storage
    • Various utilities (Soda, hydrochloric acid, natural gas, compressed air)
  • Development of PDF schemas (Process Flow Diagram) after validation of the block schema
  • Technical specification and consultation of the main packages: static furnace, quenching, smoke treatment and bromine extraction
    • Vertical static brine combustion furnace, dual-fuel natural gas/oil burners 3 MW
    • Smoke quenching system for cooling from 800 °C to 70 °C (graphite quench and water spray)
    • Purification of flue gases by venturi and spray column, devesicator and scrubber with activated carbon filling, extraction of purified bromine brines
    • Bromine extraction columns with steam and chlorine injection
  • Realization of the overall plans of the installations for internal costing of the civil engineering, structural, piping and electrical/instrumentation/automation lots
  • Realization of utility diagrams
  • Establishment of the electrical balance sheet and list of motors
  • Estimate of CAPEX (at +/-25%) and OPEX

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on industrial effluent and chemistry and innovative materials by clicking on the following links.

L’article TREDI – Bromine Manufacturing est apparu en premier sur Emdelen.

]]>
ARKEMA – Saint-Auban https://emdelen.fr/en/effluent-treatment-arkema-saint-auban/?utm_source=rss&utm_medium=rss&utm_campaign=effluent-treatment-arkema-saint-auban Thu, 14 Feb 2019 12:52:58 +0000 https://emdelen.fr/?p=3256 Redesign of effluent treatment
Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months

L’article ARKEMA – Saint-Auban est apparu en premier sur Emdelen.

]]>

Redesign of effluent treatment

Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months

Context of the project: Arkema has a biological station and a physico-chemical station in Saint-Auban. The biological plant treats Arkema’s industrial effluents and effluents from the city of Saint-Auban. The city will stop sending its effluents, making the biological station oversized and inadequate. The project therefore consists in migrating the treatment from the biological station to the physico-chemical station, which is obsolete and has been shut down for several years. The effluents discharged must comply with the new Ministerial Order and the BREFs

Studies :

  • Study and definition of the segregation of effluent flows:
    • Acidic flows without TSS or COD that only require pH adjustment
    • Flows loaded in TSS and/or COD
    • Fluxes loaded with adsorbable organic halogen and aromatic organochlorine
    • Neutral flow without any need for treatment
  • Pilot laboratory tests
    • Neutralization
    • Physico-chemical treatment
    • Adsorption on activated carbon
    • Ozone oxidation
  • Based on the results of laboratory tests:
    • Definition of the physico-chemical treatment process
    • Definition of the size of the structures
    • Audit of the existing station
    • Validation of existing recoverable equipment
    • Creation of new works
    • Definition of activated carbon filters
  • Implementation of PIDs, functional analysis, implementation plans
  • CAPEX, OPEX and planning

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on industrial effluents as well as on chemistry and innovative materials by clicking on the links.

L’article ARKEMA – Saint-Auban est apparu en premier sur Emdelen.

]]>
SANOFI – New treatment plant https://emdelen.fr/en/sanofi-new-treatment-plant/?utm_source=rss&utm_medium=rss&utm_campaign=sanofi-new-treatment-plant Thu, 14 Feb 2019 13:08:44 +0000 https://emdelen.fr/?p=3272 New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months

L’article SANOFI – New treatment plant est apparu en premier sur Emdelen.

]]>

New effluent treatment plant for the vaccines business

Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months

Context of the project: following the conversion of the Neuville Sur Saône chemical site with the establishment of a vaccines business (Sanofi Pasteur) and the gradual closure of the chemistry business, the existing effluent treatment facilities were obsolete. The construction of a new effluent treatment plant dedicated to the vaccines business was necessary. This station must be scalable to keep pace with the growth of the vaccines business.

Pollutant to be treated: COD, BOD5, TSS, Global Nitrogen, Total Phosphorus

Emdelen Mission :

  • Flow balance, material balance and definition of the treatment chain
    • Water channel (biological) including the following steps:
      • Homogenization of effluents in buffer tanks
      • Neutralization of effluents
      • Biological cultures on mobile media with syncopation to alternate nitrification and denitrification sequences
      • Separation of the bio-mass by pressurized float
      • Coagulation of effluents leaving the floater
      • Filtration of effluents on rotating screens
      • Counting and discharge of effluents in the natural environment
    • Sludge filter comprising the following steps:
      • Storage of sludge coming out of the floater
      • Sludge conditioning
      • Sludge dewatering on filter presses
    • Definition and preparation of reagents: lime milk, polymer, ferric chloride
    • Treatment of tank vents on activated carbon filtration
  • Realization of PID schematics
  • Writing of the Functional Analysis, definition of the PLC inputs/outputs and the automation architecture
  • Single-wire electrical diagram and power balance
  • Implementation of implementation plans
  • Allocation of the project
  • Specifications and consultation of equipment batches
  • Specification and consultation of work packages
  • Analysis and comparison of offers
  • Drafting of control documents and operation of the station
  • Listing of laboratory equipment required for operation
  • Planning, Capex (€2.5m) and Opex

Total amount of the project :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on industrial effluents as well as on chemistry and innovative materials by clicking on the links.

L’article SANOFI – New treatment plant est apparu en premier sur Emdelen.

]]>
AXENS – Catalyst production, Kentucky, USA https://emdelen.fr/en/axens-catalyst-production-kentucky/?utm_source=rss&utm_medium=rss&utm_campaign=axens-catalyst-production-kentucky Fri, 15 Feb 2019 10:17:12 +0000 https://emdelen.fr/?p=3355 Revamping and refurbishment of catalyst production lines
Location: Kentucky, USA
Project phase: Studies
Project duration: 30 months

L’article AXENS – Catalyst production, Kentucky, USA est apparu en premier sur Emdelen.

]]>

Revamping and refurbishment of catalyst production lines

Location: Kentucky, USA
Project phase: Studies
Project duration: 30 months

Feasibility / Basic design studies:

  • Carrying out balances (material, heat, utility, power)
  • Implementation of PFDs (process flow diagram)
  • Sizing of equipment and storage capacities
  • Implementation in the existing workshop
  • Preliminary security analysis
  • CAPEX, planning

Detailed design study (Process part):

  • Realization of PIDs (piping and instrumentation diagram)
  • Writing the functional analysis
  • Participation in HAZOP (Hazard and Operability analysis)
  • Drafting of technical specifications for equipment

Total amount of the project : AXENS – Catalyst production, Kentucky, USA :

Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million

You can find our different realizations on chemistry and innovative materials by clicking on the following link.