Others Industries
Our Clients
Specific skills
- Semi-industrial pilot manufacturing
- Pilot industrialization
- Writing process book
- Installation, depollution, energization
- Industrial transfer
- Equipment integration
- Process integration
Some achievements
COLEMAN – Modifications of gas distribution networks
Modifications to the propane and butane distribution networks to take into account the new PPRT (Technological risk prevention plan)
Location: Saint-Genis Laval (69)
Project Phases: Detailed design study
Study period: 4 months
EMILE NOEL Oil Mill – Feasibility transfer industrial
Feasibility engineering preliminary to an industrial transfer of a seed crushing unit, oil conditioning and associated liquid and solid storage.
Location : Pont-Saint-Esprit, Gard FRANCE
Project Phase : Feasibility study (Master Plan)
Project Duration : 4 months
LORD Fly By Wire – Preliminary engineering
Preliminary engineering for an industrial transfer of a manufacturing and maintenance unit for flight control systems.
Location: Saint Vallier, Drôme FRANCE
Project phase: Studies
Project duration: 6 months
ESOPP Engineering – Studies – Plastic Packaging Films
Engineering studies of piping and cable routing
Location: Chambéry Savoie FRANCE
Project phase: Engineering studies
Project duration: 6 months
SPMR – Fire Protection Network
Construction of the fire protection network for a fuel depot
Location: Villette-de-Vienne (38)
Project phases: engineering study, implementation and commissioning
Project duration: 36 months
SOLO – Waste Gasification Plant
Installation of a waste gasification plant and electricity production
Location: Solo, Indonesia
Project phase: Engineering studies
Project duration: 12 months