Preliminary engineering for an industrial transfer of a manufacturing and maintenance unit for flight control systems.
Location: Saint Vallier, Drôme FRANCE
Project phase: Studies
Project duration: 6 months
Engineering studies of piping and cable routing
Location: Chambéry Savoie FRANCE
Project phase: Engineering studies
Project duration: 6 months
Construction of the fire protection network for a fuel depot
Location: Villette-de-Vienne (38)
Project phases: engineering study, implementation and commissioning
Project duration: 36 months
Installation of a waste gasification plant and electricity production
Location: Solo, Indonesia
Project phase: Engineering studies
Project duration: 12 months
Complete project management of a new production line for special glasses
Location: Bagneaux-sur-Loing FRANCE
Phases : Basic and detailed Design studies, Implementation and commissioning
Project duration : 30 months