AXENS – Recovery station

AXENS – Recovery station

Installation of a station for the recovery of precious metals contained in liquid effluents from catalyst production workshops
Location: Salindres (30)
Project phase: Study, implementation and start-up
Project duration: 18 months

COLEMAN – Modifications of gas distribution networks

COLEMAN – Modifications of gas distribution networks

Modifications to the propane and butane distribution networks to take into account the new PPRT (Technological risk prevention plan)
Location: Saint-Genis Laval (69)
Project Phases: Detailed design study
Study period: 4 months

EMILE NOEL Oil Mill – Feasibility transfer industrial

EMILE NOEL Oil Mill – Feasibility transfer industrial

Feasibility engineering preliminary to an industrial transfer of a seed crushing unit, oil conditioning and associated liquid and solid storage.
Location : Pont-Saint-Esprit, Gard FRANCE
Project Phase : Feasibility study (Master Plan)
Project Duration : 4 months