EVERE – Fos-sur-Mer
Audit, improvement, reliability and debottlenecking of the wastewater treatment plant
Location : Fos-sur-Mer (13)
Project phases: Feasibility studies
Study period: 2 months
Audit, improvement, reliability and debottlenecking of the wastewater treatment plant
Location : Fos-sur-Mer (13)
Project phases: Feasibility studies
Study period: 2 months
Treatment of effluents from the Pierre Bénite plant
Location: Pierre Bénite (69)
Project phases: Diagnosis, Project Management Assistance, EPCM
Project duration: 18 months
Implementation of smoke treatment for all existing furnaces
Location: Vénissieux, Rhône, FRANCE
Project phase : Studies and implementation
Project duration : 18 months
Turnkey project for the construction of a skid for the treatment (COD: Determination of Chemical Oxygen Demand) of radioactive effluents from the dismantling of a workshop at a nuclear site.
Location: Dessel, Belgium
Project phases: Study, realization, assembly and start-up
Project duration: 36 months
Unit for manufacturing bromine from used bromine brines
Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months
Redesign of effluent treatment
Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months