Unit for manufacturing bromine from used bromine brines
Location: Plaine de l’Ain Industrial Park – Saint-Vulbas (01)
Project Phase: Preliminary Project-Summary studies necessary to determine the amount of investment and obtain operating costs.
Study period: 2 months
Redesign of effluent treatment
Location: Saint-Auban (04)
Project phases: Feasibility studies
Study period: 6 months
New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months
Revamping and refurbishment of catalyst production lines
Location: Kentucky, USA
Project phase: Studies
Project duration: 30 months
Debottlenecking of a catalyst impregnation production line
Location: West Virginia, USA
Project phase: APS and APD studies
Project duration: 14 months
Modification of a catalyst impregnation production line
Location: Saudi Arabia
Project phase: Basic and detailed design studies
Project duration: 22 months