Basic studies utilities, HVAC, electricity CF cf, second work, detection and fire protection

Project phase : Basic studies for utilities, electricity, finishing, fire detection and protection.
Project duration : 1 year

Our confidential client is one of the world leaders in perfumery and flavours. It is the source of a long list of the most famous flavours and aromas you enjoy every day.

The project consisted in expanding the perfume factory, doubling the surface area of the building, offering a storage capacity equivalent to 12,000 pallets, with 25 self-guided vehicles for the transport of components as well as four computer-aided production lines supplied via 60 km of piping.

For this project, the client entrusted EMDELEN with the following studies:

  • APD utilities

    • Air Conditioning/Ventilation/Heating (HVAC)
    • Ice water distribution network.
    • Refrigeration units
    • Hot water distribution network
    • High voltage electricity, lightning protection, lighting
    • Low voltage electricity, telephony, IT, time distribution, remote display, fire detection, alarm, access control, video surveillance, gas detection
    • Sanitary facilities
    • Sanitary appliances
    • Water networks of various qualities
    • Compressed air and high vacuum
    • Fire protection (sprinkler)
    • Centralized Technical Management (CTM) of the building
  • APD Secondary work

    • Partition wall – ceiling – insulation lot
    • Tile set – faïence
    • Soft floor lot
    • Plastering and painting batch
    • Sanitary equipment batch
    • Wooden interior joinery set (door)
    • Locksmith’s shop (incl. railing, handrail, grille)
    • Hot and cold room construction set
  • APD fire detection and protection

    • Risk classification in the new premises
    • Hydraulic calculations
    • Establishment of a PFD (Process Flow Sheet) sprinkler
    • Establishment of the consultation specifications
    • Verification of the sizing of the water source
    • Implementation of fire protection for the 18-storey automatic storage warehouse for flammable liquids.
    • Feasibility study of high expansion protection and comparison with the sprinkler solution

Total amount of the project:

Range A: < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D: > €50 million

You can find our various realizations on chemistry and innovative materials by clicking on the link.