New effluent treatment plant for the vaccines business
Location: Neuville-sur- Saône (69)
Project Phases: Detailed Preliminary Project Study
Study period: 2 months
Context of the project: following the conversion of the Neuville Sur Saône chemical site with the establishment of a vaccines business (Sanofi Pasteur) and the gradual closure of the chemistry business, the existing effluent treatment facilities were obsolete. The construction of a new effluent treatment plant dedicated to the vaccines business was necessary. This station must be scalable to keep pace with the growth of the vaccines business.
Pollutant to be treated: COD, BOD5, TSS, Global Nitrogen, Total Phosphorus
Emdelen Mission :
- Flow balance, material balance and definition of the treatment chain
- Water channel (biological) including the following steps:
- Homogenization of effluents in buffer tanks
- Neutralization of effluents
- Biological cultures on mobile media with syncopation to alternate nitrification and denitrification sequences
- Separation of the bio-mass by pressurized float
- Coagulation of effluents leaving the floater
- Filtration of effluents on rotating screens
- Counting and discharge of effluents in the natural environment
- Sludge filter comprising the following steps:
- Storage of sludge coming out of the floater
- Sludge conditioning
- Sludge dewatering on filter presses
- Definition and preparation of reagents: lime milk, polymer, ferric chloride
- Treatment of tank vents on activated carbon filtration
- Water channel (biological) including the following steps:
- Realization of PID schematics
- Writing of the Functional Analysis, definition of the PLC inputs/outputs and the automation architecture
- Single-wire electrical diagram and power balance
- Implementation of implementation plans
- Allocation of the project
- Specifications and consultation of equipment batches
- Specification and consultation of work packages
- Analysis and comparison of offers
- Drafting of control documents and operation of the station
- Listing of laboratory equipment required for operation
- Planning, Capex (€2.5m) and Opex
Total amount of the project :
Range A < €10 million
Range B: between €10 and €20 million
Range C: between €20 and €50 million
Range D > €50 million
You can find our different realizations on industrial effluents as well as on chemistry and innovative materials by clicking on the links.